Khamis Mushayt:
Master Plan & Infrastructure Design for Aseer Second Industrial City

Disciplines

  • Masterplanning
  • Transport and Infrastructure

Companies

Dorsch Holding GmbH KSA

Construction Sum

SAR 4.5 Billion

Client

Saudi Authority for Industrial Cities and Technology Zones (MODON)

Duration

From 2019 to 2021

Project Activities

  • Site appraisal and data collection
  • EIA
  • Transportation assessment
  • Market study
  • Feasibility & business plan
  • Concept master plan city wide (18.7 km2)
  • Concept infrastructure city wide (18.7 km2)
  • Detailed master plan (3 km2)
  • Detailed infrastructure design
  • Tender & IFC package

Contact

Dorsch Holding GmbH KSA

Riyadh (Headquarters)
8498 King Fahd Road, Al Mohammadiyyah District
Unit No: 7499

Riyadh 12363 4218
Kingdom of Saudi Arabia


Fax: +966 11 433 6664
E-Mail: ksa@dorsch.com

View in maps

Description

The main objective was to implement and develop a master plan and infrastructure for Aseer Second Industrial City (approximately 18.7 km2) at a concept level and proceed to detailed master plan and infrastructure .