Rhine-Neckar Metropolitan Region (Rhineland-Palatinate):L 532 – Local bypass Böhl-Iggelheim
Disciplines
- Roads
- Environment & Sustainability
Companies
GRE German Rail Engineering GmbH
Client
Public Mobility Office Rheinland-Pfalz (Speyer)
Duration
From 2010 to 2021Project Activities
- Analysis of variants
- Project planning for traffic facilities, HOAI Lph 1-4
- Acoustical investigation within the scope of noise precaution according to 16. BImSchV
- Calculation of air pollutants according to RLuS
- Accompanying landscape conservation plan, expert report on species protection, avifaunistic report, EIA report incl. assessment of impacts according to Directive 2012/18/EU (Seveso III Directive)
Contact
GRE German Rail Engineering GmbH
Frankfurt (Headquarters)
Hugo-Eckener-Ring
D-60549 Frankfurt am Main
Deutschland
Phone: +49 30 24749-0
E-Mail: info@gre-rail.com
Description
The planning measure comprises a feasibility study with a study of variants, the planning of the Böhl-Iggelheim bypass including 3 junctions and a 4-arm roundabout to connect the town as well as its landscape conservation and noise investigation. The OU is expected to reduce through traffic by more than 50 %. Due to the high groundwater table and the numerous drainage ditches, crossing structures and flood culverts are planned and the risk of flooding is taken into account through the appropriate location of the road gradient.
Construction length: 3.4 km