Doberlug-Kirchhain (Elbe-Elster district):ESTW Doberlug-Kirchhain u.Bf. line 6345 km 115.894 to km 118.016
Disciplines
- Railways
Companies
GRE German Rail Engineering GmbH
Construction Sum
ca. 25 Mio €
Client
DB Netz AG
Duration
From 2021 to 2023Project Activities
- Project planning for traffic facilities Lph 1-4
- Technical planning of control and safety systems Lph 1-4
- Specialist planning of electrical energy systems Lph1-4
Subcontractor services:
- Specialist planning of overhead line systems
Contact
GRE German Rail Engineering GmbH
Frankfurt (Headquarters)
Hugo-Eckener-Ring
D-60549 Frankfurt am Main
Deutschland
Phone: +49 30 24749-0
E-Mail: info@gre-rail.com
Description
The Doberlug-Kirchhain lower station is located on the double-track electrified main line of the 6345 Cottbus - Halle (Saale) line.
The aim of the construction measure is to replace the existing signalling systems (mechanical, unit design) with an electronic signal box (ESTW). The signal box will be built in modular construction. The new interlocking (ESTW-A) will be operated from the existing sub-centre in Finsterwalde (ESTW-Z).
In connection with the construction work, the two level crossing facilities on the L60 will be converted. The facilities will be equipped with full barriers and one danger area monitoring system each.
The renewal of the control and safety technology and the related measures to be planned include in detail:
- Reconstruction area approx. 15 km
- New construction of an electronic interlocking of the SIMIS D type
- Adaptation of the signalling system ESTW-Z Finsterwalde
- Signal adaptation ESTW-A BDKO (Doberlug-Kirchhain station, upper station of the Berlin - Dresden line)
- Train number signalling system
- Modification of 2 technically secured level crossings in several construction stages
- Adaptation of the electronic equipment as follows:
- Adaptation of the feed of the ESTW-A
- Installation of track field lighting
- Adaptation of the point heating stations
- Adaptation of the overhead line systems