Bangkok, Thailand (15 Dec. 2014)
Tunnel Boring Machine (TBM) breaks through at MRTA Sanam Chai Station presently being constructed following the first under river crossing (Chao Phraya River) for the MRTA Blue Line Extension Rail Project.
Dorsch Consult Asia, Ltd. is a Joint Venture Partner with the Project Management Consultants.